head_banner

News

  • High-Quality Disc Screens from a Trusted OEM Supplier

    As a trusted OEM supplier, we specialize in the manufacturing of high-performance disc screens designed for efficient material separation in waste-to-energy, recycling, and industrial processes. With years of experience and a strong technical background, we are proud to support leading equipment ...
    Read more
  • municipal solid waste

    Municipal solid waste (MSW), often called garbage or trash, is the everyday waste generated by households, businesses, and institutions, including items like food scraps, paper, plastics, and yard waste. Here’s a more detailed breakdown: Definition: MSW encompasses solid waste ...
    Read more
  • Bottom Ash Handling System

    A Bottom Ash Handling System (BAHS) is a system designed to efficiently collect, transport, and dispose of or process bottom ash (also known as clinker ash) that settles at the bottom of a boiler after coal combustion. It’s a crucial part of a power plant’s operation, ensuring prope...
    Read more
  • Different types of Ash Handling Systems

    Ash handling systems are typically categorized into three main types: fly ash handling, bottom ash handling, and ash slurry disposal. These systems utilize various methods, including mechanical, pneumatic, and hydraulic systems, to collect, transport, and store ash from various points within a th...
    Read more
  • mechanical conveying equipment for boiler ashes and fly ash residue

    Mechanical conveying equipment for boiler ashes and fly ash residue typically includes pneumatic systems, hydraulic systems, and various types of conveyors, such as submerged drag chains, belt conveyors, and bucket elevators, depending on the specific ash type and handling requirements. Detailed ...
    Read more
  • several waste-to-energy (WtE) projects with integrated carbon capture and storage (CCS) components

    Klemetsrud WtE Facility, Oslo, Norway: In December 2023, Aker Carbon Capture and Aker Solutions signed a Front-End Engineering Design (FEED) contract with Hafslund Oslo Celsio to develop carbon capture at the Klemetsrud waste-to-energy facility. The project aims to capture up to 400,000 tonnes ...
    Read more
  • Canada’s first waste-to-energy facility with integrated carbon capture and sequestration

    Alberta’s Industrial Heartland (Upcoming): Announced in June 2024, a partnership involving Gibson Energy, Varme Energy, and the Canada Growth Fund plans to develop Canada’s first waste-to-energy facility with integrated carbon capture and sequestration. Located near Edmonton, this fac...
    Read more
  • a WtE facility near the Al-Dhafra landfill

    Abu Dhabi, United Arab Emirates: In March 2024, a consortium led by Marubeni Corporation, including Kanadevia Inova and the Japan Overseas Infrastructure Investment Corporation for Transport & Urban Development (JOIN), was selected to design, build, and operate a WtE facility near the Al-Dhaf...
    Read more
  • a new household WtE plant

    Corrèze, France: In November 2024, VINCI Construction was awarded a contract exceeding €100 million to design and build a new household WtE plant near Brive-la-Gaillarde. The facility will have a treatment capacity of 79,000 tonnes per year, equivalent to the annual waste produced by 200,000 resi...
    Read more
  • a WtE plant

    Chiayi City, Taiwan: In October 2024, JFE Engineering Corporation received an order for major equipment for a WtE plant from ECOVE Chiayi Energy Corporation. The plant is designed with a processing capacity of 500 tonnes per day and is part of the Green Energy Sustainable Circulation Center BOT P...
    Read more
  • The Jeram WtE plant

    Kuala Selangor, Malaysia: In October 2023, AFRY was awarded a contract by Worldwide PMC Sdn. Bhd. to provide owner’s engineering services for a WtE project. The Jeram WtE plant will have a capacity of approximately 2,700 tonnes per day, producing a net electrical output of up to 52 MW for e...
    Read more
  • the Hagenholz WtE facility

    Zurich, Switzerland: In September 2023, Kanadevia Inova was selected by Entsorgung + Recycling Zurich to build a new line at the Hagenholz WtE facility. Scheduled to be operational in 2026, the new line will increase the plant’s capacity by 120,000 tonnes of waste annually, generating 48 MW...
    Read more